What is the minimum distance between the sewage system pipes and heating cable?

The distance between the heating cable and sewage system pipes must be at least 5 cm. In floors less than 3 cm high, it is recommended to increase this distance to 10 cm.

Обратный звонок

[recaptcha]


Зворотній зв'язок

[recaptcha]


Back call

[recaptcha]


Заказ


Замовлення


Order